You are here

Beginning Design and Development

After completion and approval of the System Requirements, the systems engineering process moves into the design and development phase:

As the project timeline illustrates, however, many of the tasks in building the I-210 Pilot proceed in parallel rather than in a linear way, and ongoing work in several project areas has contributed to the design and development effort. These areas include:

  • Organizational design
  • Response plan development
  • AMS (Analysis, Modeling, and Simulation)
  • Corridor preparation